Voters in two of Orange County’s school districts overwhelmingly approved the bond measures before them on their Nov. 3 general election ballots.
Read more How high have the November king tides been in Southern California? Some break, tie records
Under California’s Proposition 39, at least 55% of voters in each district needed to approve the respective measures for them to pass. Both measures cleared that mark without issue.
The Laguna Beach Unified School District had its Measure A approved, receiving over 68% of votes cast in the district this election as of Tuesday, Nov. 24, according to unofficial results released by the Orange County Registrar of Voters.
authorizes the school district to issue and sell $83 million in bonds to repair and upgrade aging classrooms, science labs and school facilities. Some of the district’s schools, which were built between 1930 and 1968, “don’t meet current accessibility or building safety standards,” according to the district.
Long Beach Unified serves about 2,500 students across two elementary schools, one middle school and one high school.
Measure A will allow the district to provide “modern labs, career technical education facilities” and equipment for students to support college and career readiness, according to the district.
Funding from the bonds issued will also allow the district to upgrade emergency communication and fire safety systems, reinforce facilities with fire-resistant materials and “manage landscaping to create defensible space from wildfires,” according to the district. Older campuses lie in a high-severity wildfire zone, as previously reported.
The $83 million in bonds, which the Long Beach Unified Board of Trustees placed on the general election ballot, means an annual tax levied on taxable property at a rate of $8.85 per $100,000 of assessed value, translating to about $5 million annually, to pay off the debt by 2057.
Measure A essentially replaces the district’s existing school bond tax, Measure R, which voters approved in 2001. That measure is set to expire in 2028 at an expected tax rate of $8.85 per $100,000 of assessed value, according to the district.
Read more For Cal State Fullerton’s Doucette, developing relationships is key
Meanwhile, Westminster School District’s Measure B was also approved with nearly 69% of the vote as of Tuesday, Nov. 24, according to the registrar’s office’s unofficial results.
authorizes the school district to issue and sell $128 million in general obligation bonds to fund classroom upgrades, facility repairs and improvements across its 17 campuses.
Westminster School District serves nearly 7,800 TK-8 students in Westminster, Garden Grove, Huntington Beach and Midway City.
Repayments of the $128 million in bonds would translate to levies of $30 per $100,000 in assessed property value to be collected on property tax bills through fiscal year 2060-61. A typical homeowner in the school district would pay about $143 per year, or $11.92 per month, according to the district.
The school district’s board of trustees placed the measure on the ballot, saying the bonds would allow Westminster School District to implement several renovations and repairs included in its five-year Facilities Master Plan, which officials said was developed with the community.
The district said its campuses, while they are well-maintained, are 60 to 70 years old and are in need of “significant repairs and upgrades.” According to the measure put before voters, 135 classrooms and school facilities had leaky roofs, while another 150 portable classrooms across its campuses are at least 20 years old and “many are falling apart, with structural damage and water leaks that can lead to mold.”
Measure B is the second bond measure that Westminster School District voters have passed in the past decade. In 2016, voters overwhelmingly approved Measure T, a $76 million bond measure.
Though there are significant facility needs that remain, the district has said funding from Measure B will “begin addressing” the more than $730 million worth of needs identified in the Facilities Master Plan.
Read more After the storm comes rebuilding, demolishing for coastal homes impacted by high waves, floods